RSG Mobile | Studio Bundle
Questions? Reach out to our simulator experts at: 734-417-5281 or fill out the form below.
With the RSG Mobile Studio Bundle, you can access a full premium golf simulator set without breaking the bank. This bundle includes a full enclosure, projector, mount, hitting mat, tripod, and the RSG Mobile launch monitor app (available on iPhones).
No expensive hardware - Just your iPhone and a PC for instant golf simulation at world-famous courses.
Instant Playability – No need for expensive launch monitors. Get started in minutes.
Real Courses, Real Golf – Play on the world's best courses without leaving home.
Instant Swing Analytics – Improve your game with real-time feedback and data.
Affordable & Accessible – The most budget-friendly way to practice and play.
Computer Specs
Operating System: Windows® 11 64 bit Intel Core i5 Quad-Core S Mode disabled.
Graphics Card: Dedicated GPU (Graphics Card): OpenGL 4.6 compatible card with 4GB GDDR5 RAM and latest Video Drivers (no more than 6 months old)
Storage: 6GB Hard Disk Drive free storage space
RAM: 16GB RAM (Memory)
Connections: Ethernet port or Ethernet to USB Adapter - that is Linux/Windows compatible.
Internet: Persistent Internet connection of 5Mbps for software installation, updates, Premium course delivery, and online play
Golf, RAIN OR SHINE, DAY OR NIGHT.
Watch how the RSG Mobile transforms your space into a golf simulator in seconds. Real clubs, real balls, real gameplay—just set up, sync your iPhone with your PC and swing.
FAQs
What devices are compatible with the Red Stakes Golf Mobile app?
The app is currently compatible with iPhones running iOS 15 or later. The app is not compatible with Android devices. Your iPhone's camera is used to track ball and swing data.
How much space do I need to set this up?
We recommend a space at least 12 feet wide, 12 feet deep, and 9 feet high to swing safely and accommodate the net. Great for garages, backyards, and basements.
Do I need any additional hardware to start playing?
To run the software and play courses/ranges you will need a Windows 11 PC.
How do I redeem my free app download?
Each bundle comes with a unique code. Just follow the instructions provided in the email to download the app from the App Store and enter your code to activate.
What kind of golf experiences does the app offer?
The Red Stakes Golf Mobile app lets you play full rounds on real-world courses, practice at the range, enter online tournaments, join closest-to-the-pin challenges, and more—right from your Iphone.
Is there a subscription required for the app?
Out of the box you get access to one course and the driving range for life. You can get access to all courses, ranges, and online play for $199.99/yr.